GYPSUM STACK EXPANSION PHASE 2 Site preparation works, Design, proof filling, backfilling, Construction of Pond, Supply & installation of HDPE Liner Supply & installation of Geo-composite, soil cement, Silica, Geotextile, HDPE Pipe, Booster Pump Pad, Gypsum Slurry Pipelines,
Earthworks
Asphalt Paving and Road
The primary objective of this project is to provide a new gas dew point control unit at Abqaiq NGL Plants as a permanent solution to resolve liquid condensation and accumulation in the gas pipelines and the resultant liquid flaring at Shedgum Gas Plant & Berri Gas Plant.
Transportation Services, Collection of Potash from Ship at Ras Al Khair Port Berth and Deliver to DAP II Warehouse.
MFC Oily Water Sewer Sump Station Metal. Supply of Metal Crew for Spool Fabrication, Civil Work to Sandblast existing Oily Water Sump Station Cover and Sealing it with 150mm Concrete Slab .
Re-Route Pipelines in Ras tanura Area Project
-Site Preparation, Excavation, Backfilling, Marl Capping
Sulfate Removal Facilities Backfilling Works
Road & Infrastructure to Maritime Yard-
Site preparation including clearing & grubbing, imported fill, electrical & distribution of transformer, sanitary wastewater manhole, underground utilities and road works
ISCC Power Plant – Civil Works Pkg. 1 Earthworks & site preparation, temporary access roads, evaporation pond, security pericentral fence of Type 4, external drainage
Copyright © 2022 AFAC - All Rights Reserved.
Powered by AFAC IT
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.